660HA IP; 255HA C&R
Minimum Land plots 5,000 M2
2.000 M2
on-site 24/7
Supplied by Quang Ngai Electricity Company (EVN) High tension (22KV); Low tension (380V)
45,000 m3/day; Phase I: 5,000 m3/day
12,000m3/day; Phase 1: 6,000m3/day Phase 2: 6,000m3/day
1,200 lines